Welcome to our official website

National Service Hotline:15632799296

KAILANDEDYNAMIC

ABOUT DYNAMIC

Recommended reading:

Hot Tags:

货架 仓储货架 仓库货架 轻型货架 中型货架 重型货架 库房货架 货架 货架厂家 货架供应商 高位货架 北京货架

Yinchuan automation stereoscopic warehouse factory preparation early preparations

Source:www.kldats.cn Author:凯兰德自动化立体库 Release time:2022-07-04 Reading times: 583 Second

Enterprises in the early preparation automated multi-layered storehouse typically take these factors have a clear recognition of the following and planning, automated stereoscopic warehouse project once built, to transform may spend a lot of cost.


1, inventory capacity: three-dimensional storage capacity, including all need temporary storage and there is the amount of items in the warehouse;


2, system working ability: three-dimensional warehouse logistics system (throughput) dispatch, storage and operation ability;


3, yinchuan automation stereoscopic warehouse factory information processing: stereoscopic warehouse information processing ability, including information collection, information processing, information query, information and communication, and even business information processing ability;


4, surrounding logistics processing: how to unload the goods, inspection, set plate, to the top shelf of roadway, the goods from the top shelf after demolition plate, merging, sorting, handling, loading and other processing;


5, man-machine connection capacity: operator interface with the system, man-machine interface, data entry, inspection of nonconforming product processing, into the automatic handling line, etc.;


6, functional requirements: inbound, outbound, transport, information processing, operation and maintenance, etc.;


7, the requirements of the degree of automation, manual, semi-automatic and fully automatic, etc.;


8, auxiliary requirements: video monitoring, temperature and humidity measurement and control, entrance guard, artificial carrying vehicles, etc.;


9, boundary conditions, the site conditions (length, width, high), power supply, ground base, etc.;


10, the time limit for a project: experience design, procurement, manufacturing, processing, assembly, control and management of software development, testing, packaging, transportation, installation, debugging, acceptance and training, and other links, time is too short to ensure high quality.


11, don't be the pursuit of a single (kind of) equipment, high-performance, and ignored the overall system performance;


12, all kinds of requirements shall be appropriate, yinchuan automated stereoscopic warehouse factory the key is to meet the requirements of their own use. Request too low doesn't satisfy the need to use, requires too much will make the system cost is too high, lower reliability, hard to implement and maintain or poor flexibility change;


13, system maintenance is very important, and maintain the sense of the car, should be regularly to maintain system, make the system in good working condition, prolong the service life of system, find the problems in time;


14, good for the use of automated stereoscopic warehouse, need to have professional management and maintenance personnel.

Link:
Solemn statement: do not reprint the pictures of this website without permission. Violators will be prosecuted!
[statement] the purpose of reprinting online media manuscripts on this website is to spread more information. Such manuscripts do not represent the views of this website, and this website does not bear joint and several liability for the infringement of such manuscripts. Therefore, if you find that the content of this website infringes your copyright, please send the relevant content to this email【 vip@bjstb.com 】, we will delete it immediately after confirmation to ensure your copyright.

Related dynamics

  • 2023-05-30
  • 2023-05-30
  • 2023-05-22
  • 2023-05-22
  • 2023-05-22
  • 2023-05-10
Screenshot, wechat identification QR code
wechat:13701264023
(Click wechat copy to add friends)
Open wechat